Battersea Power Station Phase 3A
Main Contractor: Sir Robert McAlpine
Client: Permasteelisa (UK) Limited
Start Date: 2 September 2020
Finish Date: 2 September 2022
Facade Installations/ Glazing and Cladding, Building 1/ PP1:
- Unitized System 7,256 m2
- Fascia Spandrel, Cladding, Soffits, Cills 6,479 m2
- Smoke & fire barriers at slab edge connection 2,656 m1
- Fly-service brackets 906 no
- Sliding Doors, Double Doors and Single Doors
Facade Installations/ Glazing and Cladding, Building 2/ PP2:
- Unitized System 9,075 m2
- Fascia Spandrel, Cladding, Soffits, Cills 6,605 m2
- Smoke & fire barriers at slab edge connection 3,444 m1
- Fly-service brackets 1,336 no
- Sliding Doors, Double Doors and Single Doors
Facade Installations/ Glazing and Cladding, Podium:
- Opaque and glazed steel Stick System elements 2,937 m2
- Canopy steel structures, glazing and pipework
- Cladding
- Stainless Steel Gutter
- Rainwater Pipes